In 2010 Sony Professional Solution Europe confronted us with a real
challenge: The installation of two displays together with a steel mounting
construction for FC AU MMARENA in Le Mans, France, had to precisely
follow the same time plan as the roof construction. And that required
nothing short of a logistical master stroke.
Solution
Thanks to our highly professional installation team on site, the entire
process was completely smoothly and without a hitch. In other words,
we succeeded in precisely coordinating the installation of our S[quadrat]
SO [10/20] LED video displays with the time plan for the construction of
the stadium roof. The S[quadrat] SX [ScoreboardTV] hardware and
software is to be used to generate the content on both displays – in
French of course! As a result, our football stadium content management
system is now available in four languages (German, English, French and
Italian). If required, this can be updated in all existing installations.
| Completion: |
October 2010 |
| Project partner: |
Sony Professional Solution Europe |
Technical data
2 x S[quadrat] SO [10/20]
Size: 2 x 43 m² = 86 m²

www.lemansfc.fr