Challenge
Kolping Arena was looking to impress guests of the 2009 Hockey World
Championships with new video displays. What did that mean for us?
Exactly three days to remove the old equipment and install the new displays.

Solution
Even with the unusually short timeframe, we were able to successfully install
the new video cube displays as well as all control components such as the horn,
control console at field level, the goal lights and even the clocks in the locker
rooms. In addition, the roof’s low load capacity meant that only very light
constructions could be used.

Completion:  March 2009
Project partner:   
Habegger AG

Technical data
4 x S[quadrat] SI [10 SMD]
Size: 3.84 m x 2.24 m = 8.6 m²

4 x S[quadrat] LED Scoreboards
Size: 3.84 m x 1.52 m = 5.8 m²

www.kolping-arena.ch